No | Uraian (Description) | Keterangan (Explanation) |
---|---|---|
1 | Pengelola / Operator | PT Trans Marga Jateng |
2 | Mulai beroperasi (tahun) / Start of Operation (year) | 2011 |
3 | Panjang (Km) / Length (Km) | 72 |
4 | Sistem Transaksi / Transaction System | Tertutup |
5 | Jumlah Gerbang / Number of Gates | 5 |
6 | Jumlah Gardu (Total) / Total Number of Booths (Total) | 80 |
7 | Kepemilikan Saham | PT Jasamarga Transjawa Tol 50,91% |
8 | Aktif Konsensi (Tahun) / End Year of Concession | 2060 |
9 | VC Ratio | 0,3 (A) – 0,3 (B) |
10 | Lokasi Jalan Tol / Toll Road Location | Jawa Tengah |
Semarang-Solo Toll Road that spans 72.6 km is operated by TMJ. As part of Trans Jawa, the Semarang-Solo Toll Road will connect several areas in the Central Java region, such as Semarang, Ungaran, Bawen, and Salatiga. The Semarang-Solo section 1 Semarang-Ungaran Toll Road that spans 10.8 km has been operated since 2011, followed by the operation of section 2 Ungaran-Bawen in 2014. In 2017, section 3 (three) Bawen-Salatiga that spans 17.5 km and in 2018, the Salatiga-Kartasura Section for 32.2 km have been fully operated