No | Uraian (Description) | Keterangan (Explanation) |
---|---|---|
1 | Pengelola / Operator | Representative Office 2 JTT |
2 | Mulai beroperasi (tahun) / Start of Operation (year) | 1983 |
3 | Panjang (Km) / Length (Km) | 24 |
4 | Sistem Transaksi / Transaction System | Terbuka |
5 | Jumlah Gerbang / Number of Gates | 9 |
6 | Jumlah Gardu (Total) / Total Number of Booths (Total) | 37 |
7 | Aktif Konsensi (Tahun) / End Year of Concession | 2044 |
8 | VC Ratio | 0,6 (A) - 0.6 (B) |
9 | Lokasi Jalan Tol / Toll Road Location | Jawa Tengah |
Along with the connection of the Trans Java Toll Road and the development of the area around the segment, It is hoped that the traffic volume will increase so that it can support the performance of the Semarang segment in the future.